Coastal data monitoring at dusk

Proven Reliability.

See how Stumpyxo turns environmental readings into decisions for coastlines across the UK.

Recent Deployments

Measured work from UK coastlines.

Highland Erosion Control

An array of high-frequency sensors was installed across exposed Highland slopes to track millimetre-scale ground movement. A mesh network keeps the array reporting through winter storms, and the operations team receives a daily shift report plus an immediate alert if movement exceeds the site threshold.

Result: continuous uptime through the first storm season, with alerts raised before movement was visible on the surface.

Victorian Sea Wall Retrofit

Fourteen vibration and pressure sensors were fitted into a 150-year-old masonry wall without cutting new openings through the face. Readings are compared with tide height so engineers can separate normal loading from a joint that is starting to fail.

Result: structural reports now show which bays need repointing, instead of a single wall-wide guess.

Estuary Biodiversity Watch

Salinity, temperature and dissolved oxygen are sampled through the tide cycle at an estuary used by three protected species. Conservation staff use the same feed to time sluice changes when a salt wedge pushes further upstream than the agreed limit.

Result: 24-hour coverage replaced weekly grab samples that missed overnight spikes.

Coastal Prediction for Planning

A planning authority on the North Sea coast needed a forward view of shoreline change, not another archive of past surveys. Live water-level and beach-profile sensors feed a model the council uses when it scores defence schemes.

Result: forecast error on seasonal shoreline position fell by about 40% against the previous manual method.

Client Feedback

What partners say about Stumpyxo.

"The level of detail from Stumpyxo changed how we talk about structural fatigue. Their sensors flagged a breach indicator two weeks before it was visible on the wall. It is the clearest monitoring spend our board has approved."

Theatrice Rawof, Director of Environmental Strategy

"Reliable, fast, and specific. Emergency estuary protocols now start from a reading, not a phone call from someone who happened to be on the bank."

Taizan F.

We chose Stumpyxo because technical support stays on the job until the node is back online. The hardware matters. The follow-through matters more.

Layed Telcius, Operations Lead